⚡ Generator Periodic Inspection: Why is a Report Issued Without a Load Test Incomplete?

rabiacaymaz94

Endüstri Vadisi
Hello,

The most common deficiency I see in the field: generator periodic inspection only covers the electrical side. Panel connections are measured, earth resistance is taken, and the report is closed. However, a generator has a combustion engine, a fuel system, and an exhaust line, and all of them pose a risk in operation.

I have compiled the scope of the inspection and what should be written in the report for colleagues working in maintenance and electrical departments.

📋 Legal basis and periodicity
In Annex-III of the Regulation on Health and Safety Conditions in the Use of Work Equipment, the generator line states: 1 year if no period is specified in the standards, the criterion is TS ISO 8528 series. If the manufacturer's instructions or risk assessment require a shorter period, the shorter one is applied; which source takes precedence in which situation is explained in the period determination guide. For the intervals of other equipment: Annex-III period table

🔧 Inspection must cover all three areas
AreaInspected
ElectricalEarth continuity and resistance, panel connection tightness, protective devices, cable insulation, labeling
MechanicalEngine leaks, belt tension, cooling system, vibration mounts, exhaust line integrity
OperationalAutomatic start-up time, operation under load, battery status, fuel level and tank integrity

The acceptable resistance limit for earthing measurement on the electrical side varies according to the type of facility: limit values in earthing measurement. If the calibration of the device used for measurement is not valid, the measured value will not be traceable: earthing measurement device calibration

⚠️ Is a generator that is not operated under load considered inspected?
No, it is not. A generator running idle shows that the starting system and engine are working; but it does not show:
  • The start-up time
  • Voltage and frequency stability under load
  • The behavior of the cooling system under actual load
The purpose of the periodic inspection is to show that the equipment will work when needed; the test must simulate that condition. If a load test cannot be performed because the facility does not allow an interruption, this situation should be written in the report with its justification. Presenting an untested test as tested is the most serious of the situations that invalidate the report.

⏱️ Automatic start-up time: the only measurable performance indicator
When the grid goes out, the time it takes for the generator to start up is measured and written in the report as a number. Simply marking "suitable" is not enough, because the criterion for suitability varies according to the needs of the facility: the acceptable time in a facility requiring uninterrupted power is much lower than that in a warehouse.

⛽ Is the fuel tank a separate inspection item?
It can be. The daily fuel tank is usually considered part of the equipment. If there is a separate underground or above-ground fuel tank at the facility, that tank is subject to periodic inspection on its own: above-ground fuel tank periodic inspection. The generator report does not cover the tank's leak-tightness.

📝 Maintenance record does not substitute for periodic inspection
The generator's monthly operation record is a maintenance activity; it does not replace the periodic inspection report. The difference between the two: difference between maintenance form and periodic inspection form

✅ What should be written in the report
In addition to the minimum information that must be included in every periodic inspection report, three generator-specific pieces of information:
  1. Engine and alternator information (make, model, power)
  2. Measured start-up time
  3. Whether a load test was performed (and the justification if not)
Sections of the form and sample items: generator periodic inspection form example

Detailed version of the topic: generator periodic inspection: scope, period and report

What situation do you encounter in the field? In facilities that do not allow load testing, what approach do you take: load bank, planned outage, or a note in the report?
 
Generator Inspection: Beyond the Electrical Pane
lA proper generator inspection must cover electrical, mechanical and operational aspects—not just earth resistance and panel connections. Engine condition, fuel system, exhaust, automatic start-up time, battery status and load testing are all important for verifying reliable operation when power is needed.


Spad Electronic — supporting industrial electrical systems, automation, inspection and reliable power solutions.
South Khorasan – Birjand – Hakim Nezari 21
+98 56 33333337 | +98 915 963 9959
www.spad1.ir |
info@spad1.ir
 
Back
Top